Cloud engineers reviewing a staged migration plan on screens in a modern Liverpool office
Cloud migration Liverpool

Move to the cloud without the migration migraines.

Legacy servers, shared files and business applications need a careful route into Azure, AWS or another suitable platform. G&J Warrington Infrastructure plans the work around your people, your data and your trading hours.

Zero lossData protection built into each migration plan.
Plan BRollback steps documented before cutover.
One leadA dedicated project manager keeps everyone informed.
The method

A proven six-step migration path.

Good cloud migration planning removes surprises early. We set owners, dependencies, test points and communication dates before anyone changes production.

01

Discovery and inventory

We map servers, storage, applications, identities and data flows so the starting point is clear.

  • Asset and ownership register
  • Application dependency map
02

Readiness assessment

We test technical fit, security posture, performance baselines and likely costs before recommending a route.

  • Risk and readiness scorecard
  • Prioritised remediation list
03

Migration planning

We choose rehost, replatform or refactor for each workload, then set sequencing, owners and change windows.

  • Phased migration roadmap
  • Cost and capacity forecast
04

Testing and pilot

A representative workload moves first. We check integrations, access, performance and user tasks before wider change.

  • Test evidence and acceptance criteria
  • Stakeholder sign-off record
05

Cutover with rollback

We coordinate the change freeze, communications, final checks and controlled switch. The reversion route is ready before the window opens.

  • Cutover runbook and contact tree
  • Rollback decision points
06

Post-migration support

Hypercare covers performance tuning, user questions, documentation and a measured handover into ongoing management.

  • Handover pack and operating guide
  • 30-day support review
Readiness first

Know before you move.

A cloud readiness assessment gives your team a practical starting point. We look past the server list and examine the links between systems, users, security controls and day-to-day work.

  • Infrastructure inventory and dependency mapping
  • Performance baselines, security posture and access risks
  • Azure, AWS and hybrid cost projections
  • A tailored roadmap with clear next decisions
Discuss your assessment

Sample scorecard

78%
Infrastructure fit84%
Application dependencies71%
Security readiness82%
Operational readiness75%

The final scorecard is specific to your estate. It highlights blockers, quick actions and the safest order for migration waves.

What we move

Whatever you're moving, we've done it.

Some businesses need a single weekend cutover. Others need a hybrid transition over several months. We shape the route around operational risk.

Servers and infrastructure

Move physical or virtual workloads into right-sized Azure or AWS services with tested network and identity controls.

Azure Migrate · AWS MGN · IaaS design

Files and collaboration

Plan Microsoft 365 migration, SharePoint structures and permissions so staff can find the information they need.

Microsoft 365 · SharePoint · OneDrive

Business applications

Assess rehost, replatform or refactor options for line-of-business systems, including integration and user testing.

App services · Containers · Hybrid patterns

Databases and business data

Protect data integrity with replication, validation checks and a cutover sequence built around recovery objectives.

SQL workloads · Managed databases · Replication
The critical window

Zero-drama cutover, always with a plan B.

Cutover is a controlled operation. Your people know when change starts, what they should expect and who makes the call if conditions change.

The cutover checklist

  • Agree a low-impact window and change freeze.
  • Send a plain-English communication plan to stakeholders.
  • Run final backups, validation checks and access tests.
  • Keep the migration lead available throughout hypercare.

Measured result: a 200-user professional services firm completed its move with two hours of planned downtime and a documented return route.

Rollback flow

1Monitor validation checks and business sign-off
2Pause the change if an agreed threshold is missed
3Revert within the defined recovery time objective
4Review evidence and set the next safe window
After go-live

We don't disappear after go-live.

The first month matters. We stay close while users settle in, costs become visible and the new environment proves itself under normal working pressure.

Hypercare

Immediate support for the first 30 days after cutover.

  • Performance tuning
  • Issue triage
  • User questions

Handover

Your team receives clear records rather than a folder of unexplained settings.

  • Architecture notes
  • Runbooks and ownership
  • Training sessions

Ongoing management

Move into managed cloud services when you want a steady operational partner.

  • Monitoring and response
  • Cost reviews
  • Security improvements
Explore managed cloud services
IT director reviewing Azure migration metrics with a logistics operations team in Leeds
Client outcome

A complex estate moved with control.

"We knew exactly what would happen on cutover day. The team kept our operations moving and gave us evidence at every stage."
Jaidev Sadza, IT Director, Leeds logistics company
40servers moved to Azure
35%lower infrastructure costs
0data loss recorded
99.9%post-migration uptime

Plan your move with confidence.

Your first step is a practical migration readiness assessment. We will review your estate, explain the risks and set out sensible next actions. There is no obligation to continue.

Prefer email? [email protected]